SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Conversion (CON)
Technologies: Conversion: Electric, Not District Heat (ELE)
Technologies: Conversion: Centralised (CEN)
Technologies: Conversion: Base Loaded (BAS)
TIME SERIES DATA 1990 2000 2010 2020 2030 2040 2050
Annual availability 0.75 0.75 0.75 0.75 0.75 0.75 0.75
(decimal fraction)
Bound on capacity 119.64 126.65 123.04 91.52 60 60 60
Lower (gigawatts)
Bound on capacity 119.65 126.66 126.66 126.66 126.66 126.66 126.6
Upper (gigawatts)
Bound on activity: conversion/process technology 2527 2800
Upper (petajoules)
Annual fixed O&M cost 53.5 53.5 53.5 53.5 53.5 53.5 53.5
(1995 EURO(ECU)/gigawatts)
Energy carrier input: conversion technology 3.217 3.217 3.217 3.217 3.217 3.217 3.217
Fossil Equivalent (do not delete) (petajoules/petajoules)
Energy carrier input: conversion technology 1.2 1.2 1.2 1.2 1.2 1.2 1.2
Uranium for power plant [GJ] (petajoules/petajoules)
Total cost of investment in new capacity 2440 2440 2440 2440 2440 2440 2440
(1995 EURO(ECU)/gigawatts)
Fraction of capacity in peak equations 1 1 1 1 1 1 1
(decimal fraction)
Residual installed capacity 81.87 81.87 78.26 41.1 3.94 0 0
(gigawatts)
TIME INDEPENDENT DATA TID
Fraction of unavailability which is forced outage 0.5
(decimal fraction)
Units of activity/unit of capacity 31.536
(petajoules/gigawatts)
Lifetime of new capacity 40
(number of years)
Electricity output 1
Electricity (decimal fraction)
Start year 1990
(calendar year)