MATTER 4.2 Input Data Technology EN0

The table on this page contains MARKAL input data for the MATTER 4.2 model. The MATTER 4.2 model was converted from MUSS to ANSWER format in December 1999.
Information regarding the model input is available from ECN, Dolf Gielen (gielen@ecn.nl). More background on this project can be found in a number of recent publications.

Disclaimer


EN0 : LWR power plant


SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Conversion (CON)
Technologies: Conversion: Electric, Not District Heat (ELE)
Technologies: Conversion: Centralised (CEN)
Technologies: Conversion: Base Loaded (BAS)

TIME SERIES DATA                                             1990       2000       2010       2020       2030       2040       2050 
Annual availability                                          0.75       0.75       0.75       0.75       0.75       0.75       0.75 
  (decimal fraction)
Bound on capacity                                            119.64     126.65     123.04     91.52      60         60         60   
  Lower  (gigawatts)
Bound on capacity                                            119.65     126.66     126.66     126.66     126.66     126.66     126.6
  Upper  (gigawatts)
Bound on activity: conversion/process technology             2527       2800                                                        
  Upper  (petajoules)
Annual fixed O&M cost                                        53.5       53.5       53.5       53.5       53.5       53.5       53.5 
  (1995 EURO(ECU)/gigawatts)
Energy carrier input: conversion technology                  3.217      3.217      3.217      3.217      3.217      3.217      3.217
  Fossil Equivalent (do not delete)  (petajoules/petajoules)
Energy carrier input: conversion technology                  1.2        1.2        1.2        1.2        1.2        1.2        1.2  
  Uranium for power plant [GJ]  (petajoules/petajoules)
Total cost of investment in new capacity                     2440       2440       2440       2440       2440       2440       2440 
  (1995 EURO(ECU)/gigawatts)
Fraction of capacity in peak equations                       1          1          1          1          1          1          1    
  (decimal fraction)
Residual installed capacity                                  81.87      81.87      78.26      41.1       3.94       0          0    
  (gigawatts)

TIME INDEPENDENT DATA                                        TID
Fraction of unavailability which is forced outage            0.5
  (decimal fraction)
Units of activity/unit of capacity                           31.536
  (petajoules/gigawatts)
Lifetime of new capacity                                     40
  (number of years)
Electricity output                                           1
  Electricity  (decimal fraction)
Start year                                                   1990
  (calendar year)