MATTER 4.2 Input Data Technology EGA

The table on this page contains MARKAL input data for the MATTER 4.2 model. The MATTER 4.2 model was converted from MUSS to ANSWER format in December 1999.
Information regarding the model input is available from ECN, Dolf Gielen (gielen@ecn.nl). More background on this project can be found in a number of recent publications.

Disclaimer


EGA : Existing gas turbine CHP plant


SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Conversion (CON)
Technologies: Conversion: Electric, Not District Heat (ELE)
Technologies: Conversion: Decentralised (DCN)
Technologies: Conversion: Standard (not BAS/NLM)

TIME SERIES DATA                                             1990       2000       2010       2020       2030       2040       2050 
Annual availability                                          0.8        0.8        0.8        0.8        0.8        0.8        0.8  
  (decimal fraction)
Bound on capacity                                            7.17       5.17       2.59       1.2955     0.001      0.001      0.001
  Lower  (gigawatts)
Bound on capacity                                            7.18       5.18       5.18       3.59       2          1.5025     1.005
  Upper  (gigawatts)
Annual fixed O&M cost                                        11         11         11         11         11         11         11   
  (1995 EURO(ECU)/gigawatts)
Bound on investment in new capacity                                                                      0.001      0.001      0.001
  Upper  (gigawatts)
Energy carrier input: conversion technology                  3.23       3.03       3.03       3.03       3.03       3.03       3.03 
  Gas for electricity generation [GJ]  (petajoules/petajoules)
Total cost of investment in new capacity                     760        760        760        760        760        760        760  
  (1995 EURO(ECU)/gigawatts)
Energy carrier output: conversion technology                 1.74       1.56       1.56       1.56       1.56       1.56       1.56 
  High temperature steam [GJ]  (petajoules/petajoules)
Fraction of capacity in peak equations                       1          1          1          1          1          1          1    
  (decimal fraction)
Residual installed capacity                                  2          0          0          0          0          0          0    
  (gigawatts)
Annual variable O&M cost                                     0.5        0.5        0.5        0.5        0.5        0.5        0.5  
  (1995 EURO(ECU)/petajoules)

TIME INDEPENDENT DATA                                        TID
Fraction of unavailability which is forced outage            1
  (decimal fraction)
Units of activity/unit of capacity                           31.536
  (petajoules/gigawatts)
Lifetime of new capacity                                     25
  (number of years)
Electricity output                                           1
  Electricity  (decimal fraction)
Start year                                                   1990
  (calendar year)