MATTER 4.2 Input Data Technology ED0

The table on this page contains MARKAL input data for the MATTER 4.2 model. The MATTER 4.2 model was converted from MUSS to ANSWER format in December 1999.
Information regarding the model input is available from ECN, Dolf Gielen (gielen@ecn.nl). More background on this project can be found in a number of recent publications.

Disclaimer


ED0 : Existing oil fired power plant


SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Conversion (CON)
Technologies: Conversion: Electric, Not District Heat (ELE)
Technologies: Conversion: Centralised (CEN)
Technologies: Conversion: Standard (not BAS/NLM)

TIME SERIES DATA                                             1990       2000       2010       2020       2030       2040       2050 
Annual availability                                          0.75       0.75       0.75       0.75       0.75       0.75       0.75 
  (decimal fraction)
Bound on capacity                                            67.33      46.87      25.38      1.36       0.001      0.001      0.001
  Lower  (gigawatts)
Bound on activity: conversion/process technology             650        400        342.894286 285.788571 228.682857 171.577143 114.4
  Lower  (petajoules)
Annual fixed O&M cost                                        24         24         24         24         24         24         24   
  (1995 EURO(ECU)/gigawatts)
Energy carrier input: conversion technology                  2.7        2.6        2.5        2.5        2.5        2.5        2.5  
  Residual fuel oil for electricity [GJ]  (petajoules/petajoules)
Total cost of investment in new capacity                     860        860        860        860        860        860        860  
  (1995 EURO(ECU)/gigawatts)
Fraction of capacity in peak equations                       1          1          1          1          1          1          1    
  (decimal fraction)
Residual installed capacity                                  41.95      21.49      0          0          0          0          0    
  (gigawatts)
Annual variable O&M cost                                     0.26       0.26       0.26       0.26       0.26       0.26       0.26 
  (1995 EURO(ECU)/petajoules)

TIME INDEPENDENT DATA                                        TID
Fraction of unavailability which is forced outage            1
  (decimal fraction)
Units of activity/unit of capacity                           31.536
  (petajoules/gigawatts)
Lifetime of new capacity                                     30
  (number of years)
Electricity output                                           1
  Electricity  (decimal fraction)
Start year                                                   1990
  (calendar year)