MATTER 4.2 Input Data Technology EC7

The table on this page contains MARKAL input data for the MATTER 4.2 model. The MATTER 4.2 model was converted from MUSS to ANSWER format in December 1999.
Information regarding the model input is available from ECN, Dolf Gielen (gielen@ecn.nl). More background on this project can be found in a number of recent publications.

Disclaimer


EC7 : Integr. lignite gasification power plan


SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Conversion (CON)
Technologies: Conversion: Electric, Not District Heat (ELE)
Technologies: Conversion: Centralised (CEN)
Technologies: Conversion: Base Loaded (BAS)

TIME SERIES DATA                                             1990       2000       2010       2020       2030       2040       2050 
Annual availability                                          0.75       0.75       0.75       0.75       0.75       0.75       0.75 
  (decimal fraction)
Bound on capacity                                                       0.25       0.25       0.25       0.001      0.001      0.001
  Lower  (gigawatts)
Bound on capacity                                                       1          15.5       30                                    
  Upper  (gigawatts)
Annual fixed O&M cost                                        31         31         31         31         31         31         31   
  (1995 EURO(ECU)/gigawatts)
Energy carrier input: conversion technology                  2.27       2.175      2.08       2.04       2          2          2    
  Lignite for electricity [GJ]  (petajoules/petajoules)
Total cost of investment in new capacity                     1600       1600       1470       1470       1470       1470       1470 
  (1995 EURO(ECU)/gigawatts)
Fraction of capacity in peak equations                       1          1          1          1          1          1          1    
  (decimal fraction)
Annual variable O&M cost                                     0.3        0.3        0.3        0.3        0.3        0.3        0.3  
  (1995 EURO(ECU)/petajoules)

TIME INDEPENDENT DATA                                        TID
Fraction of unavailability which is forced outage            1
  (decimal fraction)
Units of activity/unit of capacity                           31.536
  (petajoules/gigawatts)
Lifetime of new capacity                                     30
  (number of years)
Electricity output                                           1
  Electricity  (decimal fraction)
Start year                                                   2000
  (calendar year)