MATTER 4.2 Input Data Technology BR1

The table on this page contains MARKAL input data for the MATTER 4.2 model. The MATTER 4.2 model was converted from MUSS to ANSWER format in December 1999.
Information regarding the model input is available from ECN, Dolf Gielen (gielen@ecn.nl). More background on this project can be found in a number of recent publications.

Disclaimer


BR1 : Coniferous rndwd conventional North


SET MEMBERSHIP LIST
All Technologies (TCH+SRCENCP)
Technologies: Process (PRC)
Technologies: Process: Standard (PRE)

TIME SERIES DATA                                             1990       2000       2010       2020       2030       2040       2050 
Annual availability                                          1          1          1          1          1          1          1    
  (-)
Bound on activity: conversion/process technology             40         35.00125   30.0025    25.00375   20.005     15.00625   10.00
  Lower  (petajoules)
Bound on activity: conversion/process technology             42         42.1875    42.375     42.5625    42.75      42.9375    43.12
  Upper  (petajoules)
Annual fixed O&M cost                                        57         56         55.857143  55.714286  55.571429  55.428571  55.28
  (1995 EURO(ECU)/unit/annum)
Energy carrier input: process technology                     0.46       0.48       0.5        0.51       0.52       0.53       0.55 
  Diesel for transport sector [GJ]  (petajoules/unit)
Material input: process technology                           1.95       1.93       1.92       1.91       1.92       1.91       1.9  
  LABOUR [MAN-HOUR]  (unit of volume for MVOs/unit)
Material output: process technology                          0.1        0.1        0.1        0.1        0.1        0.1        0.1  
  BARK [T]  (unit of volume for MVOs/unit)
Material output: process technology                          1          1          1          1          1          1          1    
  ROUNDWOOD NORTH (12% H2O) [T]  (unit of weight for MWTs/unit)
Annual variable O&M cost                                     14         14         13         13         13         12         12   
  (1995 EURO(ECU)/unit)

TIME INDEPENDENT DATA                                        TID
Units of activity/unit of capacity                           1
  (-)
Lifetime of new capacity
  (number of years)
Start year                                                   1990
  (calendar year)