Outreach: Examples Register
Update of this ETSAP Outreach Register
The ETSAP Outreach Register presented below is built and maintained by
the Operating
Agent (OA). ETSAP Partners are kindly requested to add new activities
or update information by sending the
information to the OA (to: oa@etsap.org).
Responsibility for timeliness and correctness of the
information provided rests of course
exclusively with the ETSAP partners, or their local counterparts.
The examples include both projects and training activities.
Examples
BANGLADESH
| 1. COUNTRY |
Bangladesh |
| 2. LOCAL COUNTERPART |
Organisation:
Bangladesh Institute of Development Studies
Contactperson:
Dr. M. Asaduzzaman
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Received 2 weeks of training at Brookhaven supplemented only by
occasional fax or email assistance.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under Round 2 of the U.S. Country Studies Program. Received
further
support from ABARE as part
of the ALGAS project |
BULGARIA
| 1. COUNTRY |
Bulgaria |
| 2. LOCAL COUNTERPART |
Organisation:
Energoproekt
Contactperson:
Katja Simeonova
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
3 weeks training on MARKAL at Brookhaven, followed by one or two
weeks of additional training and assistance in their country (or in
the case of Nigeria, in the US) as well as considerable support by
email and fax.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under U.S. Country Studies Program |
CHINA
| 1. COUNTRY |
China |
| 2. LOCAL COUNTERPART |
Organisation:
CINIE
Contactperson:
- |
| 3. ETSAP COUNTERPART |
Organisation:
DecisionWare Inc. (DWI) and ECN
Contactperson:Gary Goldstein and Tom Kram,
respectively
E-mail: gag@bnlarm.bnl.gov and kram@ecn.nl
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
-
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
17 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
- |
COLOMBIA
Two examples:
McGill
| 1. COUNTRY |
Colombia |
| 2. LOCAL COUNTERPART |
Organisation:
University Los Andes
Dept. of electrical engineering,
Bogota, Colombia
WWW: http://www.uniandes.edu.co
Contactperson: Ms. Angela Cadena (now at Univ. of
Geneva)
|
| 3. ETSAP COUNTERPART |
Organisation:
McGill University
Faculty of Management,
1001 Sherbrooke Street West
H3A 1G5, Montreal, Quebec, Canada
phone: 1-514-340-6042 and 398 4013
fax: 1-514-340-5665 and 398-7399
Contactperson:Richard Loulou, PhD, Professor of
Management Science
E-mail: loulou@management.mcgill.ca
WWW: http://www.crt.umontreal.ca/~loulou/
|
4. SPONSORING/
FINANCING BODIES |
Total budget: more than 30,000 USD
Source: COLENCIA, Colombian Council of Science
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Training seminars, data-base construction, initial runs in
Canada,
later runs in other country, report on initial scenario runs
Project completed in 1993
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
8 December 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Maintained until to-day |
PSI
| 1. COUNTRY |
Colombia |
| 2. LOCAL COUNTERPART |
Organisation:
UNIDAD DE PLANEACION MINERO-ENERGETICA
Avenida 40 A No. 13 - 09 Piso 5
Bogota - COLOMBIA, S.A.
phone: +57-1- 2856726
fax: +57-1- 2887419
E-mail: upme1@inter.net.co
Contactperson: German CORREDOR AVELLA - Director
General and Ms. Angela Cadena (until October 1998 at Univ. of
Geneva)
E-mail: cadena@uni2a.unige.ch
|
| 3. ETSAP COUNTERPART |
Organisation:
PAUL SCHERRER INSTITUTE (PSI)
General Energy Research
CH-5232 Villigen PSI
Switzerland
phone: +41 (0)56 310 4142
fax: +41 (0)56 310 4412
Contactperson: Dr. Olivier BAHN and Socrates
KYPREOS
E-mail: Olivier.Bahn@psi.ch
WWW: http://www1.psi.ch/www_f5_hn/Systems/eneco/eneco_ho.html
|
4. SPONSORING/
FINANCING BODIES |
Total budget: -
Source: Paul Scherrer Institute
Unidad de Planeacion Minero-Energetica and COLCIENCIAS
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
To evaluate the benefits to be gained from Joint Implementation
(JI) projects to curb CO2
emissions, we have developed a "Joint MARKAL" model. We use it to
identify JI projects in
Colombia, that Switzerland could finance to comply with emission
reduction commitments.
To the same end, we are currently implementing a "Joint MARKAL-MACRO"
model.
Time schedule for the project is March 1997 to October 1998.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
Main responsibilities of the Colombian team are to build and
maintain a complete MARKAL and
MARKAL-MACRO models and apply them to study CO2 reduction strategies
and identify possible
JI projects to be financed by Switzerland. PSI is responsible for
developing and solving the
"Joint MARKAL" and "Joint MARKAL-MACRO" models. |
| 7. DATE OF LAST UPDATE |
21 October 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
- |
Czech Republic
| 1. COUNTRY |
Czech Republic |
| 2. LOCAL COUNTERPART |
Organisation:
SEVEn
Contactperson:
Milos Tichy
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
3 weeks training on MARKAL at Brookhaven, followed by one or two
weeks of additional training and assistance in their country, as well
as considerable support by email and fax.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under U.S. Country Studies Program |
EQUADOR
| 1. COUNTRY |
Equador |
| 2. LOCAL COUNTERPART |
Organisation:
ESDOL (Escuela Superior Politecnica del Litoral)
Guayaquil
Equador
Also actively involved:
INE (Instituto Nacional de Energia),
INECEL (Instituto Ecuatoriano de Electrificacion),
CEPE (Corporacion Ecuatoriana de Petroleos)
Contactperson: German Maldonado, at Chalmers
Univ. of Techn.
phone : +46 31 7721440
fax : +46 31 7723592
email : german@me.chalmers.se
|
| 3. ETSAP COUNTERPART |
Organisation:
Energy Systems Technology Div.
Chalmers University of Technology
S 412 96 Göteborg
Sweden
phone: +46 31 7721000
fax: +46 31 7723592
WWW: http://www.entek.chalmers.se/est.html
Contactperson: Prof. Clas Otto Wene
E-mail: cow@entek.chalmers.se
|
4. SPONSORING/
FINANCING BODIES |
Total budget: -
Source: CONVEP (Consejo Nacional de Universidades y Escuelas
Politecnican), BITS in Sweden and Chalmers University of Technology
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Personnel from Equador was trained in MARKAL and a database was set up
for
Equador. The project was completed in 1986 and there has been no
MARKAL
activities for several years.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
11 November 1997 (per E-mail) |
| 8. ADDITIONAL INFORMATION |
- |
ESTONIA
Two examples:
Talinn and Chalmers
| 1. COUNTRY |
Estonia |
| 2. LOCAL COUNTERPART |
Organisation:
Tallinn technical university
Kopli 82
Tallinn EE0004
Estonia
phone: + 372 6203754
fax: + 372 6203751
WWW : not known
Contactperson: Dr. Olev Liik
E-mail: olevliik@cc.ttu.ee
|
| 3. ETSAP COUNTERPART |
Organisation:
Energy Systems Technology Div.
Chalmers University of Technology
S 412 96 Göteborg
Sweden
phone: +46 31 7721000
fax: +46 31 7723592
WWW: http://www.entek.chalmers.se/est.html
Contactperson: Dr Tomas Larsson
E-mail: tola@entek.chalmers.se
|
4. SPONSORING/
FINANCING BODIES |
-
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
During three consecutive years scientists from Estonia visited
Chalmers in
order to learn MARKAL, set up a database for the country and gradually
improve this database. In addition and parallell, MARKAL activities
evolved
in Estonia. The project was completed in 1996 and Estonia now has an
operational MARKAL model that is frequently used for various analysis.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
11 November 1997 (per E-mail) |
| 8. ADDITIONAL INFORMATION |
- |
Talinn and ECN
| 1. COUNTRY |
Estonia |
| 2. LOCAL COUNTERPART |
Organisation:
Tallinn technical university
Kopli 82
Tallinn EE0004
Estonia
phone: + 372 6203754
fax: + 372 6203751
WWW : not known
Contactperson: Dr. Olev Liik
E-mail: olevliik@cc.ttu.ee
|
| 3. ETSAP COUNTERPART |
Organisation:
ECN Policy Studies
PO Box 1
1755 ZG Petten
The Netherlands
phone: +31-224-564431
fax: +31-224-563338
Contactperson:Tom Kram
E-mail: kram@ecn.nl
WWW: http://www.ecn.nl/unit_bs/main.html
|
4. SPONSORING/
FINANCING BODIES |
Budget: -
Source: EU (PHARE programme)
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
The EU PHARE project aims to support development of an Energy
Strategy for Estonia. ECN collaborated with Tallinn Technical
University
on Phase 2, Development and Analysis of Scenarios. Main activities
included
an update and extension of the MARKAL technology database, developed
earlier through cooperation with Sweden (see Tallinn and Chalmers), development of
socio-economic background scenarios and associated energy service
demand
projections, analysis of base-case and variant scenarios and reporting
on
results and findings.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
Main contractor is Tebodin Engineers and Contractors, the Hague.
ECN
and Novem are subcontractors to Tebodin. Various Estonian universities
and
consulting firms were involved as local counterparts and experts.
|
| 7. DATE OF LAST UPDATE |
21 April 1998 (TK) |
| 8. ADDITIONAL INFORMATION |
As a follow-up, 1 week MARKAL-MACRO training was provided to
Stockholm
Environment Institute, Tallinn at ECN in July 1997 (Sponsored by UNEP
Centre, Risoe.) |
ETHIOPIA
| 1. COUNTRY |
Ethiopia |
| 2. LOCAL COUNTERPART |
Organisation:
Ethiopian Energy Authority
Contactperson:
Omar Mohamed Getta
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
3 weeks training on MARKAL at Brookhaven, followed by one or two
weeks of additional training and assistance in their country, as well
as considerable support by email and fax.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under U.S. Country Studies Program |
INDIA
Two examples:
TERI and ECN
| 1. COUNTRY |
India |
| 2. LOCAL COUNTERPART |
Organisation:
TATA Energy Research Institute (TERI)
Darbari Seth Block, Habitat Place
Lodhi Road
110 003 New Delhi
India
phone: +91-11-4622246
fax: +91-11-4621770
Contactperson: Dr. Leena Srivastava - Project
Coordinator
Dr. Sujata Gupta - Fellow
E-mail: sujatag@teri.ernet.in
WWW:
|
| 3. ETSAP COUNTERPART |
Organisation:
ECN Policy Studies
PO Box 1
1755 ZG Petten
The Netherlands
phone: +31-224-564431
fax: +31-224-563338
Contactperson:J. Remko Ybema, Tom Kram
E-mail: ybema@ecn.nl
WWW: http://www.ecn.nl/unit_bs/main.html
|
4. SPONSORING/
FINANCING BODIES |
Total budget: ?
Source: Dutch Ministry of Foreign Affairs
Directorate-General for International Cooperation (DGIS)
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
The project "Indian Greenhouse Gas Abatement Strategies" is one of
four subprojects within a broad TERI-ECN collaborative research
programme, aiming to support and strengthen sustainable energy
technology developments and policies. The specific objectives are to
(a) transfer the MARKAL model and train TERI staff to address long-
term energy-related environmental issues in India; (b) apply the model
to analyze GHG abatement strategies; (c) support Indian policy makers
to fulfill FCCC reporting requirements and assist TERI in
contributions to international studies such as ADB-ALGAS.
Besides tangible results such as an operational Indian
implementation of an advanced modelling tool, experienced scientific
staff to operate the model and a comprehensive scenario analysis of
GHG abatement options, intangibles are also anticipated like an
increased institutional capacity to address sustainable energy
development and increased awareness of sustainable
energy developmenty problems and opportunities.
Time schedule for the project is June 1995 to May 1997 (project
completed)
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
Main responsibilities of TERI are to collect data on the Indian
energy system, build and maintain a MARKAL model for India and apply
this to explore GHG reduction opportunities using the MARKAL least-
cost approach. ECN provides training to TERI staff in the use of the
PC-MARKAL/MUSS system and gives advice on suitable model structures
and data to be implemented. TERI will report on the findings in
written form and by organising workshops to present and discuss
assumptions, results and recommendations. |
| 7. DATE OF LAST UPDATE |
21 August 1997 |
| 8. ADDITIONAL INFORMATION |
TERI staff has participated in various ETSAP Workshops during the
project, presenting progress and results of the work (see Workshop
Proceedings). It is planned to use the MARKAL model further in next
stages of the ALGAS project, including selected GHG reduction
technologies are currently under review in the framework of ALGAS (see
also under ABARE, Australia). |
IIM and McGill
| 1. COUNTRY |
India |
| 2. LOCAL COUNTERPART |
Organisation:
Indian Institute of Management
Vastrapur
Ahmedabad
India
phone:
fax:
Contactperson: Prof. P.R. Shukla
E-mail: shukla@iimahd.ernet.in
WWW:
|
| 3. ETSAP COUNTERPART |
Organisation:
McGill University
Faculty of Management,
1001 Sherbrooke Street West
H3A 1G5, Montreal, Quebec, Canada
phone: 1-514-340-6042 and 398 4013
fax: 1-514-340-5665 and 398-7399
Contactperson:Richard Loulou, PhD, Professor of
Management Science
E-mail: loulou@management.mcgill.ca
WWW: http://www.crt.umontreal.ca/~loulou/
|
4. SPONSORING/
FINANCING BODIES |
Total budget: about 50,000 USD
Source: Shastri Indo-Canadian Institute
(funds provided by CIDA, admistered by Shastri)
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Training seminars, data-base construction, initial runs in
Canada,
later runs in other country, report on initial scenario runs
Project completed in 1996
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
8 December 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Maintained until to-day |
IRAN
| 1. COUNTRY |
Iran |
| 2. LOCAL COUNTERPART |
Organisation:
Ministry of Energy
Ministry of Culture and Higher Education
Iran
Contactperson: Alimorad Sharifi, presently in
Göteborg
phone: +46 31 7732635
E-mail: alimorad.sharifi@economics.gu.se
new address in Iran from March 1998
|
| 3. ETSAP COUNTERPART |
Organisation:
Energy Systems Technology Div.
Chalmers University of Technology
S 412 96 Göteborg
Sweden
phone: +46 31 7721000
fax: +46 31 7723592
WWW: http://www.entek.chalmers.se/est.html
Contactperson: Dr Tomas Larsson
E-mail: tola@entek.chalmers.se
|
4. SPONSORING/
FINANCING BODIES |
-
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
During 1997 a MARKAL model for Iran was set up and analysis was made.
The
analysis form part of the dissertation of Alimorad Sharifi (1997)
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
11 November 1997 (per E-mail) |
| 8. ADDITIONAL INFORMATION |
- |
KUWAIT
| 1. COUNTRY |
Kuwait |
| 2. LOCAL COUNTERPART |
Organisation:
Kuwait Institute for Scientific Research (KISR)
Department of Energy
Contactpersons:
Dr. Saad S. Al-Jandal
E-mail: sjandal@safat.kisr.edu.kw
Mr. Fareed Alghimlas
E-mail: fmqimlas@safat.kisr.edu.kw
|
| 3. ETSAP COUNTERPART |
Organisation:
DecisionWare Inc. (DWI)
Contactperson:Gary Goldstein
E-mail: gag@bnlarm.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
Kuwait Institute for Scientific Research
(KISR) / Kuwait Foundation for the Advancement of Sciences (KFAS)/
Environmental Public Authority (EPA)
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Kuwait Energy Model and database systems have been
developed using the MARKAL procedures. The project has been completed in
1997 and there has been MARKAL activities, including those related to
energy workplans for Kuwait. Staff from KISR were trained at LI on
setting-up on the MARKAL and database systems along with building a
basecase scenario. Current activities concentrates on data augmentation
and building case studies scenarios and analysis associated energy service
demand projections, sponsored by diffent governmental agencies.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
Main contractor is Kuwait
Institute for Scientific Research (KISR) collaborating with Ministry of
Electricity & Water (MEW) / Kuwait Petroleum Corporation (KPC) for analysis
of Kuwait's energy-environmental policy issues and seting-up of training
programs
|
| 7. DATE OF LAST UPDATE |
26 October 1999 (per e-mail from Dr. Saad S. Al-Jandal) |
| 8. ADDITIONAL INFORMATION |
A regional (GCC) workshop is planned in the year
2000
|
LATVIA
| 1. COUNTRY |
Latvia |
| 2. LOCAL COUNTERPART |
Organisation:
Latvian Energy Agency
Contactperson: Janis Rekis (now at Lativan
Development Agency)
|
| 3. ETSAP COUNTERPART |
Organisation:
Institute for Energy Technology
Norway
E-mail: Leif Kristian Alm
WWW: (IFE)
Contactperson: Fridtjof Unander (now at the
International Energy Agency)
E-mail:
|
4. SPONSORING/
FINANCING BODIES |
The Norwegian Ministry on Foreign Affairs |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Establish a Latvian MARKAL along with expertise in system analysis
modellation
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
13 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
- |
MEXICO
| 1. COUNTRY |
Mexico |
| 2. LOCAL COUNTERPART |
Organisation:
Universita Nacional Autonoma de Mexico
Programa Universitario de Energie (PUE)
PO Box 70-172
04510 MEXICO, D.F.
MEXICO
phone: 52-5-6228533
fax: 52-5-6228532
WWW:
Contactperson: Dr. Juan Quintanilla
E-mail: juaquin@servador.unam.mx
|
| 3. ETSAP COUNTERPART |
Organisation:
ECN Policy Studies
PO Box 1
1755 ZG Petten
The Netherlands
phone: +31-224-564431
fax: +31-224-563338
Contactperson:Tom Kram
E-mail: kram@ecn.nl
WWW: http://www.ecn.nl/unit_bs/main.html
|
4. SPONSORING/
FINANCING BODIES |
Budget: USD 16,000
Source: See 2.
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Two week training for four persons in Aug/Sep 1997
Basic MUSS and MARKAL; introduction Stochastic, MACRO and MICRO;
building of RES
Follow-up: support/comment/advise further development of MARKAL in
Mexico
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
-
|
| 7. DATE OF LAST UPDATE |
21 April 1998 (TK) |
| 8. ADDITIONAL INFORMATION |
- |
NEPAL
| 1. COUNTRY |
Nepal |
| 2. LOCAL COUNTERPART |
Organisation:
Ministry of Water Resources
Contactperson:
Lochan Acharya and Bijaya K. Vaidya
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Received 2 weeks of training at Brookhaven supplemented only by
occasional fax or email assistance.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under Round 2 of the U.S. Country Studies Program |
NIGERIA
| 1. COUNTRY |
Nigeria |
| 2. LOCAL COUNTERPART |
Organisation:
Centre for Energy Reserach and Development
Contactperson:
John-Felix Akinbami
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
3 weeks training on MARKAL at Brookhaven, followed by one or two
weeks of additional training and assistance in the US, as well as
considerable support by email and fax.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under U.S. Country Studies Program |
PHILIPPINES
| 1. COUNTRY |
Philippines |
| 2. LOCAL COUNTERPART |
Organisation:
Department of Energy
Contactperson:
Virginia B. Santos and Clovis Tupas
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Received 2 weeks of training at Brookhaven supplemented only by
occasional fax or email assistance.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under Round 2 of the U.S. Country Studies Program. Received
further support from ABARE as part
of the ALGAS project |
SRI LANKA
| 1. COUNTRY |
Sri Lanka |
| 2. LOCAL COUNTERPART |
Organisation:
University of Peradeniya
Contactperson:
Lalih S. Dissanayake
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Received 2 weeks of training at Brookhaven supplemented only by
occasional fax or email assistance.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under Round 2 of the U.S. Country Studies Program |
TAIWAN
Two examples:
BNL
| 1. COUNTRY |
Taiwan |
| 2. LOCAL COUNTERPART |
Organisation:
Taiwan Environmental Protection Agency
Contactperson:
- |
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
3-week training course in MARKAL
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Currently arranging for follow-up work |
DWI
| 1. COUNTRY |
Taiwan |
| 2. LOCAL COUNTERPART |
Organisation:
Industrial
Technology and Research Institute
Contactperson:
Dr. Ren-Tseng Young
E-mail: rentseng@itri.org.tw |
| 3. ETSAP COUNTERPART |
Organisation:
DecisionWare Inc. (DWI)
Contactperson:Gary Goldstein
E-mail: gag@bnlarm.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
-
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
4 December 1999 (per e-mail Ren-Tseng Young)
added hyperlink to local counterpart and change of e-mail |
| 8. ADDITIONAL INFORMATION |
- |
TUNESIA
| 1. COUNTRY |
Tunesia |
| 2. LOCAL COUNTERPART |
Organisation: lost touch with them
phone:
fax:
Contactperson:
E-mail:
WWW:
|
| 3. ETSAP COUNTERPART |
Organisation:
McGill University
Faculty of Management,
1001 Sherbrooke Street West
H3A 1G5, Montreal, Quebec, Canada
phone: 1-514-340-6042 and 398 4013
fax: 1-514-340-5665 and 398-7399
Contactperson:Richard Loulou, PhD, Professor of
Management Science
E-mail: loulou@management.mcgill.ca
WWW: http://www.crt.umontreal.ca/~loulou/
|
4. SPONSORING/
FINANCING BODIES |
Total budget: about 50,000 USD
Source: Canadian International Development Agency (CIDA)
|
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Training seminars, data-base construction, initial runs in
Canada,
later runs in other country, report on initial scenario runs
Project completed in 1992
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
8 December 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
- |
ZAMBIA
| 1. COUNTRY |
Zambia |
| 2. LOCAL COUNTERPART |
Organisation:
National Council for Scientific Research and Dept of Energy
Contactperson:
Dr. George Kasali and Mr. George Kahalu Kayawe, respectively.
|
| 3. ETSAP COUNTERPART |
Organisation:
Brookhaven National Laboratory (BNL)
Systems Analysis and Modeling Group
Contactperson:Ann Reisman
E-mail: reisman@ipd.dat.bnl.gov
|
4. SPONSORING/
FINANCING BODIES |
- |
| 5. PROJECT OUTLINE |
Scope, objectives, main activities, expected results, time
schedule:
Received 2 weeks of training at Brookhaven supplemented only by
occasional fax or email assistance.
|
6. ORGANISATION AND
RESPONSIBILITIES PARTNERS |
- |
| 7. DATE OF LAST UPDATE |
18 November 1997 (per e-mail) |
| 8. ADDITIONAL INFORMATION |
Under Round 2 of the U.S. Country Studies Program |
table>
|